Power projects move to meet need for 1,200 megawatts by 2000

AUTHOR(S)
Johnston, Robert D.
PUB. DATE
June 1996
SOURCE
Caribbean Business;6/20/1996, Vol. 24 Issue 24, pS32
SOURCE TYPE
Periodical
DOC. TYPE
Article
ABSTRACT
Reports on the efforts and plans of the Puerto Rico Electric Power Authority (PREPA) to meet increased power needs in the area. Planned coal-burning plant in Guayama; Proposed Ecoelectrica power facility in Guayanilla; Planned power plant in Arecibo; Repowering of power units in the power plant in San Juan.