TITLE

Choosing the route for advanced plant designs

PUB. DATE
March 1993
SOURCE
Electric Perspectives;Mar/Apr93, Vol. 17 Issue 2, p5
SOURCE TYPE
Periodical
DOC. TYPE
Article
ABSTRACT
Announces the Advanced Reactor Corporation's plans to negotiate contracts with the Department of Energy (DOE), General Electric (GE) and Westinghouse Electric. Performing `first-of-a-kind' (FOAK) engineering requirement; Each company's standardized plant design proposal; GE's Advanced Boiling Water Reactor; Westinghouse's AP600; Nuclear Regulatory Commission safety certification; Completion by 1996.
ACCESSION #
9307096281

 

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics