TITLE

14km London tunnel for HS2

PUB. DATE
June 2013
SOURCE
Modern Railways;Jun2013, Vol. 70 Issue 777, p9
SOURCE TYPE
Periodical
DOC. TYPE
Article
ABSTRACT
The article reports on the plan of rail company HS2 Ltd. to recommend additional nine kilometres of high-speed railway tunnel between Old Oak Common and Northolt in England, putting the High Speed 2 (HS2) railway project into 14 kilometres of continuous bored twin tunnels.
ACCESSION #
87806696

 

Related Articles

  • HS2 wanted sooner.  // Rail Business Intelligence;2/9/2012, Issue 407, p7 

    The article offers information on the announcement of the starting of the preparatory work on a high-speed line from Scotland to England by HS2 Ltd.

  • Integrate HS2 with northern network, says Higgins.  // Rail Business Intelligence;3/20/2014, Issue 458, p8 

    The article focuses on the recommendations published in the report "HS2 Plus" by HS2 Ltd.'s Chairman David Higgins including extension of the HS2 Phase 1 route from Lichfield to Crewe and referral of the proposed link between High Speed 2 and High Speed 1.

  • View from Westminster.  // Professional Engineering;Apr2012, Vol. 25 Issue 4, p15 

    The article offers information on government's plan for the second phase of the construction of High-Speed 2 rail project which is operating under HS2 Ltd. in Great Britain.

  • HS2 London impact in question.  // Rail Business Intelligence;7/21/2011, Issue 394, p8 

    The article reports that the impact of HS2 the high-speed line on Birmingham, Manchester, the East Midlands and Leeds, as well as more sensitive areas such as the Chilterns, is under scrutiny by Great Britain's Commons Transport Committee.

  • HS2 consultancy work.  // Modern Railways;Feb2013, Vol. 70 Issue 773, p86 

    The article announces the framework agreements for the phase two of high speed rail 'Y' route from London to Leeds, West Yorkshire and Manchester, England by High Speed Two Limited (HS2 Ltd).

  • Plan 3 for HS2 airport tunnel.  // Modern Railways;Jun2013, Vol. 70 Issue 777, p8 

    The article reports that a tunnel on the proposed High Speed 2 (HS2) railway route could be extended to allow a major development next to East Midlands Airport in England.

  • 92% growth forecast.  // Rail Business Intelligence;5/3/2012, Issue 413, p8 

    The article reports that HS2 Ltd. chief engineer Andrew McNaughton has made a forecast that the company's High-Speed Rail will show a growth of 92 percent between 2010 and 2026-2027 for the-long distance market that HS2 will ultimately serve.

  • Judge reviews HS2 challenges.  // Rail Business Intelligence;5/3/2012, Issue 413, p8 

    The article reports that the British Department for Transport (DfT) and HS2 Ltd. have issued their objections to three separate legal challenges to block the construction of the highspeed railway line, which are now being reviewed by a judge.

  • Crossrail key to integrating HS2.  // Rail Business Intelligence;5/3/2012, Issue 413, p9 

    The article reports that Transport for London (TfL) is planning to integrate HS2 Ltd.'s high-speed railroad line into the capital's transport network in London, England.

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics