TITLE

message from the president

AUTHOR(S)
Giguère, Claude
PUB. DATE
January 2013
SOURCE
Construction Canada;Jan2013, Vol. 55 Issue 1, p98
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
The article offers the author's views in keeping up with changes within the construction industry, stating that the resistance of some people to change will hinder the success of a construction project.
ACCESSION #
84730989

 

Related Articles

  • CM Certification Rocks As a Competitive Edge. Rubin, Debra K. // ENR: Engineering News-Record;6/14/2010, Vol. 264 Issue 18, p38 

    The article discusses forecasts by the Construction Management Association of America of an increase in firms using construction management certification as a competitive advantage.

  • Effect of Project Performance on Organization Performance in Sudanese Construction Industry. Sulieman, Hassan Ahmed; Adlan, Shamboul Adlan M. // Jordan Journal of Civil Engineering;2016, Vol. 10 Issue 3, p297 

    This paper aims at designing a model to relate construction project performance to Sudanese construction organization performance using financial and non-financial metrics along with objective and subjective measures. The study used an extensive literature review in the field of construction...

  • An AHP-based construction project selection method. Nandi, Soumya; Paul, Soumik; Phadtare, Milind // Decision (0304-0941);Apr2011, Vol. 38 Issue 1, p91 

    Construction projects often fail to achieve their time, budget, profitability and quality goals. This is frequently due to the failure of the contractor in selecting the most suitable project among multiple projects considering multiple selection criteria environment. The analytic hierarchy...

  • PROBLEMS OF PROJECTS AND EFFECTS OF DELAYS IN THE CONSTRUCTION INDUSTRY OF PAKISTAN. Haseeb, M.; Xinhai-Lu; Bibi, Aneesa; Maloof-ud-Dyian; Rabbani, Wahab // Australian Journal of Business & Management Research;Sep2011, Vol. 1 Issue 6, p41 

    The problem of project delays is a fact that occurs mostly in construction industry of Pakistan. Delays are always measured as expensive to all parties concerned in the projects and very often it will result in clash, claims, total desertion and much difficult for the feasibility and it slows...

  • Dragados to draft in foreign experts on Crossrail project.  // Building Design;5/6/2011, Issue 1964, p11 

    The article reports on the plan of Dragados SA, a Spanish construction firm, to draft in foreign specialist workers to work on the Crossrail project known as "C305" in Great Britain. It says that all site labour will be employed from within the country while some specialist high-level tunnelling...

  • The first step in a successful construction project. Hawkins, Christopher D.; Palmer, Cori Phillips // New Hampshire Business Review;1/27/2012, Vol. 34 Issue 2, p21 

    The article highlights the need for a construction project owner to evaluate their construction goals before hiring a contractor in the U.S. The owner must engage a designer in developing detailed specifications and drawings in a design-build project and then enters with a designer-contractor to...

  • Using a Simple Timecard to Collect Labor History. Weissgerber, George // Journal of Light Construction;Jun2013, Vol. 31 Issue 9, p27 

    The author discusses the establishment of a process to consistently and reliably collect data about a construction company's projects in order to have accurate information on which to base estimates. He talks about learning as an estimator that cost was only one part of a project and that an...

  • Analysis of Non-Excusable Delay Factors Influencing Contractors' Performance in Lagos State, Nigeria. Timothy Ibironke, Olajide; Olugbenga Oladinrin, Timo; Adeniyi, Onaopepo; Eboreime, Idowu Victor // Journal of Construction in Developing Countries;2013, Vol. 18 Issue 1, p53 

    Delays are one of the biggest problems faced by construction firms. The objectives of this study are to identify non-excusable delay factors, their effects on project completion and means of minimising these delays. A questionnaire survey was conducted to solicit the causes, effects and methods...

  • Trends of Safety Performance in Construction and Civil Engineering Projects in Pakistan. Nawaz, Tahir; Ishaq, Azam // Civil & Environmental Research;2013, Vol. 3 Issue 5, p23 

    The major construction and civil engineering projects are sponsored by public sector in Pakistan. The users contracting and bidding procedures do not offer a significant space to the aspect of safety performance in construction and engineering projects. The prevalent measures of safety are...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics