TITLE

Judge reviews HS2 challenges

PUB. DATE
May 2012
SOURCE
Rail Business Intelligence;5/3/2012, Issue 413, p8
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
The article reports that the British Department for Transport (DfT) and HS2 Ltd. have issued their objections to three separate legal challenges to block the construction of the highspeed railway line, which are now being reviewed by a judge.
ACCESSION #
75219312

 

Related Articles

  • 20 years to complete network.  // Rail Business Intelligence;1/26/2012, Issue 406, p9 

    The article informs about the report published by Great Britain Department of Transport (DfT) providing a detailed list of the 13 alterations to the original HS2 Ltd.'s Phase 1 scheme. According to HS2 Ltd., the improvements can be achieved without impacting on journey times. It is mentioned...

  • DfT downgrades HS2 economic benefits again.  // ENDS (Environmental Data Services);Apr2012, Issue 447, p26 

    The article reports on the decision of the British Department for Transport (DfT) to downgrade its estimates of the economic benefits of the proposed high-speed rail line (HS2) between London and Birmingham to just 1.20 for every pound spent. The DfT's move is said to be the fourth downgrade in...

  • Consultancy bonanza.  // Rail Business Intelligence;11/14/2013, Issue 450, p8 

    The article reports on the £190 million spent by the company HS2 Ltd. and the British Department for Transport (DfT) for consultancy of the High Speed 2 project.

  • HS2 wanted sooner.  // Rail Business Intelligence;2/9/2012, Issue 407, p7 

    The article offers information on the announcement of the starting of the preparatory work on a high-speed line from Scotland to England by HS2 Ltd.

  • Integrate HS2 with northern network, says Higgins.  // Rail Business Intelligence;3/20/2014, Issue 458, p8 

    The article focuses on the recommendations published in the report "HS2 Plus" by HS2 Ltd.'s Chairman David Higgins including extension of the HS2 Phase 1 route from Lichfield to Crewe and referral of the proposed link between High Speed 2 and High Speed 1.

  • View from Westminster.  // Professional Engineering;Apr2012, Vol. 25 Issue 4, p15 

    The article offers information on government's plan for the second phase of the construction of High-Speed 2 rail project which is operating under HS2 Ltd. in Great Britain.

  • HS2 London impact in question.  // Rail Business Intelligence;7/21/2011, Issue 394, p8 

    The article reports that the impact of HS2 the high-speed line on Birmingham, Manchester, the East Midlands and Leeds, as well as more sensitive areas such as the Chilterns, is under scrutiny by Great Britain's Commons Transport Committee.

  • HS2 consultancy work.  // Modern Railways;Feb2013, Vol. 70 Issue 773, p86 

    The article announces the framework agreements for the phase two of high speed rail 'Y' route from London to Leeds, West Yorkshire and Manchester, England by High Speed Two Limited (HS2 Ltd).

  • HS2 delivery 'very ambitious'.  // Rail Business Intelligence;11/3/2016, Issue 521, p3 

    The article reports on the schedule set by the Great Britain Department of Transport (DfT) to the high speed rail network developer HS2 Ltd. for the achievement of the delivery readiness for putting the target opening date for Phase 1 in 2026 at risk.

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics