TITLE

RISK-TAKING IN CRITICAL PATH ANALYSIS

AUTHOR(S)
Jewell, William S.
PUB. DATE
January 1965
SOURCE
Management Science;Jan1965, Vol. 11 Issue 3, p438
SOURCE TYPE
Academic Journal
DOC. TYPE
Article
ABSTRACT
In most PERT scheduling problems, uncertainties in job duration are handeled by a "wait-and-see" formulation in which it is assumed that the samples of job duration are known at the moment of scheduling; much attention has been devoted to the distribution of minimal project time under these assumptions. In this paper, a "here-and-now" formulation is proposed in which the manager takes a risk by fixing the project event times before the job durations are known; based on the allotted time interval, and the actual duration of the job, additional effort may have to be expended to stay on schedule. Under general assumptions, it is shown that minimizing the average total additional effort needed to stay on schedule will result in a cost-time scheduling problem of the CPM type.
ACCESSION #
7030230

 

Related Articles

  • R & D PROJECT PLANNING WITH Q-GERT NETWORK MODELING AND SIMULATION. Taylor III, Bernard W.; Moore, Laurence J. // Management Science;Jan1980, Vol. 26 Issue 1, p44 

    This paper describes a simulation study of two cases of research and development planning. The first case is for a series of R & D projects analyzed sequentially by a single R & D team, while the second case is for a series of R & D projects analyzed sequentially and concurrently by two teams....

  • The Harmonogram of Karol Adamiecki. Marsh, Edward R. // Academy of Management Proceedings (0065-0668);1974, p32 

    The Harmonogram, an invention by Karol Adamiecki (1866-1933), an often overlooked pioneer of management who had great influence in Poland and Russia, is presented. The invention is first described in terms of its initial impact. Then its significance to the career of Adamiecki is discussed....

  • Critical Path Analysis for New Product Planning. Wong, Yung // Journal of Marketing;Oct64, Vol. 28 Issue 4, p53 

    Since its inception in 1957, Critical Path Analysis (CPA), which includes the CRITICAL PATH METHOD (CPM), and PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) has received widespread acclaim as a planning, scheduling, and control tool. Its applications had been initially restricted to construction...

  • PERT and Fuzzy PERT Methods on Project Scheduling under Uncertainty. Petrovan, Adrian; Costea, Cristinel // Carpathian Journal of Electronic & Computer Engineering;2010, Vol. 3 Issue 1, p99 

    Program Evaluation and Review Technique (PERT) is the most widely used network modeling method used to track the planning activities required to complete large-scale projects. This technique has the potential to reduce the time and costs required to complete a project. Unlike classical PERT,...

  • Stochastic Audit Planning and Control Using GERT Simulation. Zebda, Awni // Accounting & Business Research (Wolters Kluwer UK);Summer86, Vol. 16 Issue 63, p235 

    Auditing standards require auditors adequately to plan audit engagements and properly to supervise assistants. Technically, Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) are limited because they are based on network modeling that may not be capable of representing...

  • MATRIX-BASED PROJECT PLANNING METHODS. Kiss, Judit; Kosztyán, Zsolt Tibor // Problems of Management in the 21st Century;2011, Vol. 1, p67 

    Network planning methods for project planning and scheduling have been applied for more than fifty years including CPM, PDM, PERT and GERT (Fondahl, 1961; Fulkerson, 1962; Kelley & Walker, 1959; PMI, 2206; Pritsker, 1966), which can be widely applied to project planning from areas as diverse as...

  • L'Histoire de Grandeur et de la Décadence de la Méthode PERT. Vazsonyi, Andrew // Management Science;Apr1970, Vol. 16 Issue 8, pB-449 

    The article presents the author's views on means of measuring and controlling development progress in the United States. First, the author discusses the terms PERT (Program Evaluation and Research Task) CPM (Critical Path Analysis). The author references a related document written by Andrew...

  • Business Mathematics Pert/Cost. Harper, W.M. // Accountancy;Jun66, Vol. 77 Issue 874, p436 

    This article discusses PERT/COST, a method of systematically investigating a network so as to find the most acceptable compromise between shorter project completion times and extra costs. For example, in this case job 7,8 is clearly the first job to be considered, since the whole project can be...

  • Uncertainty in Project Scheduling--Its Use in PERT/CPM Conventional Techniques. Omar, Anwar // Cost Engineering;Jul2009, Vol. 51 Issue 7, p30 

    In this article, PERT/CPM, as conventional tools for planning and controlling are discussed along with problems accompanied with their application. This article demonstrates a number of benefits, the most significant among them being that: PERT/CPM as conventional planning techniques needs to be...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics