TITLE

A new probabilistic approach to the path criticality in stochastic PERT

AUTHOR(S)
Monhor, Davaadorjin
PUB. DATE
December 2011
SOURCE
Central European Journal of Operations Research;Dec2011, Vol. 19 Issue 4, p615
SOURCE TYPE
Academic Journal
DOC. TYPE
Article
ABSTRACT
The notion of critical path is a key issue in the temporal analysis of project scheduling in deterministic setting. The very essence of the CPM consists in identifying the critical path, i.e., the longest path in a project network, because this path conveys information on how long it should take to complete the project to the project manager. The problem how can a stochastic counterpart of the deterministic critical path be defined is an important question in stochastic PERT. However, in the literature of stochastic PERT this question has so far almost been ignored, and the research into the random nature of a project duration has mainly been concentrated on the completion time in stochastic PERT in which any concrete special path is not specified. In the present paper we attempt to take first steps to fill this gap. We first developed a probabilistic background theory for univariate and bivariate marginal distributions of path durations of stochastic PERT whose joint path durations are modelled by multivariate normal distribution. Then, a new probabilistic approach to the comparison of path durations is introduced, and based on this comparison we define the concept of probabilistically critical path as a stochastic counterpart of the deterministic critical path. Also, an illustrative simple example of PCP and numerical results on the established probability bounds are presented.
ACCESSION #
66886653

 

Related Articles

  • A STATISTICAL THEORY FOR PERT CRITICAL PATH ANALYSIS. Hartley, H. O.; Wortham, A. W. // Management Science;Jun66, Vol. 12 Issue 10, pB-469 

    PERT and Critical Path techniques are enjoying exceptionally broad application in industrial and military activities. These techniques and their application have without doubt contributed significantly to better planning, control, and general organization of many programs. Although some...

  • PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT).  // Encyclopedia of Operations Research & Management Science;2001, p649 

    The article presents information on program evaluation and review technique. It is a method for planning and scheduling a project which models uncertainties in activity through the use of optimistic, likely and pessimistic time estimates for each activity.

  • Ä°ÅŸ SÃœREÇLERÄ°NÄ°N MODELLENMESÄ°NDE GERT ÅŸEBEKELERÄ°NÄ°N KULLANIMI. Aytulun, S. Kerem; Ermis, Murat // Journal of Aeronautics & Space Technologies / Havacilik ve Uzay ;2010, Vol. 4 Issue 3, p19 

    Recent years, Firms have to use various and complex business processes for providing knowledge needs that is becoming increased. With understanding impact of the business processes on performance and profitableness of the firms, many academicians and managers need to get closer these business...

  • A NOTE ON PERT TIMES. Sasieni, M. W. // Management Science;Dec1986, Vol. 32 Issue 12, p1652 

    The article discusses a verification of the PERT formula, which is used for the estimation of the mean task time in program evaluation and review techniques. The author comments on the assumption that the Pert Time equation is derived from the beta distribution in probability theory. It is...

  • CRITICAL PATH ANALYSES VIA CHANCE CONSTRAINED AND STOCHASTIC PROGRAMMING. Charnes, A.; Cooper, W. W.; Thompson, G.L. // Operations Research;May/Jun64, Vol. 12 Issue 3, p460 

    Chance-constrained programming methods are applied to examine some statistical properties of PERT networks. Using duality, the PERT method is shown to be equivalent to use of the crudest linear decision rule and the confidence (or lack thereof) in meeting constraints is explicitly presented. The...

  • ADVANCED NETWORK TECHNIQUES. O'Brien, James J. // SAM Advanced Management Journal (00360805);Fall69, Vol. 34 Issue 4, p77 

    Presents information on advanced techniques for management, such as the critical path method (CPM) and the program evaluation and review technique (PERT). Developers of CPM; Adoption of PERT by the aerospace industry; Information on some network variations.

  • The Completion Time of PERT Networks. Robillard, Pierre; Trahan, Michel // Operations Research;Jan/Feb77, Vol. 25 Issue 1, p15 

    PERT and critical path techniques have exceptionally wide applications. These techniques and their applications have contributed significantly to better planning, control, and general organization of many programs. This paper is concerned with a technical improvement in PERT methodology by...

  • A BRANCH-AND-BOUND PROCEDURE FOR THE MULTIPLE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM. Demeulemeester, Erik; Herroelen, Willy // Management Science;Dec1992, Vol. 38 Issue 12, p1803 

    In this paper a branch-and-bound procedure is described for scheduling the activities of a project of the PERT/CPM variety subject to precedence and resource constraints where the objective is to minimize project duration. The procedure is based on a depth-first solution strategy in which nodes...

  • AN ALGEBRA FOR THE ANALYSIS OF GENERALIZED ACTIVITY NETWORKS. Elmaghraby, Salah E. // Management Science;Apr1964, Vol. 10 Issue 3, p494 

    This paper generalizes the approach of activity networks, exemplified by PERT and CPM, to networks in which activates and events occur probabilistically and contain logical relationships of a more complicated nature. For example, from a specific event some activities are undertaken with...