ABSTRACT
Focuses on the processes involved in petroleum drilling. Equipment used; Steps in rotary drilling.
ACCESSION #
3654149

 

Related Articles

  • Ekofisk partners trying to contain high decommissioning costs.  // Offshore;Oct98, Vol. 58 Issue 10, p126 

    Reports that the redevelopment of the Ekofisk complex in the Norwegian North Sea has allowed drilling, production and processing to be centralized through two platforms. Examination of salvage or re-use potential; Cost recovery; Deballasting shuttle option.

  • Solo Oil announces update on the Horse Hill-1 well in the Weald Basin, UK.  // World Energy News;6/16/2014, p7 

    The article presents information on recent developments related to the Horse Hill-1 oil well located in the Weald Basin, Great Britain. Solo Oil has started site construction for the proposed 8,512 feet Horse Hill-1 well. The oil well is expected to spud in July 2014. Solo's executive director...

  • Sterling Resources announces successful fracture stimulation and well test at Breagh well A07, UK.  // World Energy News;6/16/2014, p8 

    The article reports that Sterling Resources Inc. has successfully completed fracture stimulation and production testing at the Breagh well A07 in Great Britain. The A07 well located about 2 kms to the south-east of the Alpha platform was drilled in the fourth quarter of 2013. It has been...

  • Mooring line design rules re-calibrated to include 2000-meter water depths. Mathisen, Jan // Offshore;Oct99, Vol. 59 Issue 10, p110 

    Focuses on the use of mooring line design on offshore activities of petroleum industry. Purpose of using structural reliability methods; Basic idea in reliability-based calibration; Limit state functions included in the mooring line design code.

  • Menck seeks to double depth record for underwater pile-driving.  // Offshore;Oct2004, Vol. 64 Issue 10, p90 

    Features Menck's MHU 500T pile-driving hammer. Components of a deepwater pile-driving system; Suggestion that the wide range of hammer sizes with the power packs allows underwater driving of piles from conductors to large foundation piles; Plan to install a long jumper between the hammer and the...

  • Spar technology meets Atlantic Canada's deepwater challenges. Murray, John // Offshore;Oct2004, Vol. 64 Issue 10, p92 

    Reports that a deepwater spar technology is being considered for Atlantic Canada's Orphan basin. Suggestion that the spar design can withstand impact from small bergy bits and sea ice can be managed through design features of the spar system; Capability of the spar's mooring and riser systems to...

  • Original Buchan lifts refurbished with little disruption to field operations.  // Offshore;Oct2004, Vol. 64 Issue 10, p107 

    Reports on the refurbishment of Alimak AB's passenger elevators at the Talisman Energy-operated Buchan Alpha Pentagon-design platform in the British North Sea. Challenges in replacing the elevators while minimizing disruption to Talisman Energy's oil production operations; Plan of Alimak to use...

  • Riser concept designed to reduce platform loads.  // Offshore;Oct2004, Vol. 64 Issue 10, p58 

    Reports that SEAL Engineering is developing a riser concept for ultra deepwater applications. Capability of the Hybrid S Riser system to reduce loads transmitted by the riser onto the floating production platform and to address fatigue incurred at the sag bend of steel catenary risers close to...

  • Rocket-fuel process applied successfully fop Kuito anchors.  // Offshore;Oct2004, Vol. 64 Issue 10, p87 

    Reports that IHC Hydrohammer has developed the Pyrodriver tool to push an anchor or a pile into the seabed. Advantages of the Pyrodriver over impact hammers; Suggestion that a PyroDriver is being developed for full-scale vertically loaded plate anchor.