TITLE

NASA: GAO-08-581T

AUTHOR(S)
Chaplain, Cristina T.
PUB. DATE
April 2008
SOURCE
GAO Reports;4/24/2008, p1
SOURCE TYPE
Government Document
DOC. TYPE
Article
ABSTRACT
The International Space Station (ISS), the most complex scientific space project ever attempted, remains incomplete. NASA expects the station's final construction cost will be $31 billion and expects sustainment costs through the station's planned retirement in fiscal year 2016 to total $11 billion. The space shuttle, the only vehicle capable of transporting large segments of the station into orbit, is critical to its completion. NASA plans to complete ISS assembly and retire the shuttle in 2010 in order to pursue a new generation of space flight vehicles, which will not begin to be available until 2015. To provide crew rotation and logistical support during this 5-year gap, NASA plans to rely on spacecraft developed by the commercial sector and other countries. In light of these circumstances, GAO examined the risks and challenges NASA faces in (1) completing assembly of the ISS by 2010 and (2) providing logistics and maintenance to the ISS after 2010. GAO's work to accomplish this included reviewing budget, planning, and other documents from NASA; reviewing NASA officials' testimonies; and interviewing NASA and foreign space program officials. NASA faces significant challenges in its plans to complete assembly of the International Space Station (ISS) prior to the scheduled retirement of the space shuttle in 2010. Since GAO testified on this issue in July 2007, the shuttle flight schedule has remained aggressive--slating the same number of launches in a shorter period. While NASA thinks the proposed schedule is still achievable, the schedule (1) is only slightly less demanding than it was prior to the Columbia disaster when the agency launched a shuttle every other month with a larger shuttle fleet and (2) leaves little room for the kinds of weather-related, technical, and logistical problems that have delayed flights in the past. Unanticipated delays could result in changes to the station's configuration, that is, some components may not be delivered. We have previously testified that such changes could limit the extent of scientific research that can be conducted on board the ISS. After assembly is completed and the shuttle retires, NASA's ability to rotate crew and supply the ISS will be impaired because of the absence of a vehicle capable of carrying the 114,199 pounds of additional supplies and spares needed to sustain the station until its planned retirement in 2016. For crew rotation and logistics, NASA plans to rely on Russian, European and Japanese vehicles--these vehicles were designed to augment the capabilities of the shuttle, not replace them, and have far less capacity to haul cargo. Furthermore, aside from a single Russian vehicle that can bring back 132 pounds of cargo, no vehicle can return cargo from the ISS after the shuttle is retired; and Commercially developed vehicles--NASA has pledged approximately $500 million for the development of commercial vehicles. NASA expects these vehicles will be ready for cargo...
ACCESSION #
31857929

 

Related Articles

  • NASA's Space Vision: Business Case for Prometheus 1 Needed to Ensure Requirements Match Available Resources: GAO-05-242. Li, Allen // GAO Reports;2/28/2005, p1 

    In 2003, the National Aeronautics and Space Administration (NASA) initiated the Prometheus 1 project to explore the outer reaches of the Solar System. The Prometheus 1 spacecraft is being designed to harness nuclear energy that will increase available electrical power from about 1,000 watts to...

  • GAO: NASA Fails to Budget for Delays, Cost Overruns in Delta 2 Replacement Strategy. Hill, Jeffrey // Satellite News;12/1/2010, Vol. 33 Issue 48, p1 

    The article offers information on the U.S. Government Accountability Office (GAO)'s new directive to the National Aeronautics & Space Administration (NASA) over the latter's strategy on the replacement for the Delta 2 launch vehicle. GAO found that NASA doesn't have a plan for an affordable and...

  • International Space Station (ISS) -- Ongoing Assessments for Life Extension Appear to be Supported.  // GAO Reports;4/11/2011, p1 

    The article presents the report of the U.S. Government Accountability Office (GAO) on the accuracy and level of confidence of the assessment of the National Aeronautics and Space Administration (NASA) on the safe operation and sustainability of the International Space Station (ISS) until...

  • Significant Challenges Remain for Access, Use, and Sustainment of the International Space Station.  // GAO Reports;3/28/2012, preceding p1 

    The article presents information on a study conducted by the Government Accountability Office (GAO) regarding the development in the U.S. National Aeronautics and Space Administration (NASA). It is discussed that GAO did this study to highlight the challenges which will be faced by the NASA's...

  • THE ISS -- TAKING STOCK. Baker, David // Spaceflight;Oct2015, Vol. 57 Issue 10, p376 

    The article discusses developments in the operation of the International Space Station (ISS) as of October 2015. Also cited are a report by the U.S. Government Accountability Office (GAO) on the cost of operating the ISS in 2015-2020, the delay made by the U.S. National Aeronautics and Space...

  • Key Management and Program Challenges.  // GAO Reports;2/3/2010, preceding p1 

    The article discusses the report of the U.S. Government Accountability Office (GAO) concerning the key management and program challenges faced by the National Aeronautics and Space Administration (NASA). The report examines the underutilization of the International Space Station, difficulty in...

  • INTERNATIONAL SPACE STATION.  // GAO Reports;12/15/2011, Special section p1 

    The article presents the report from the U.S. Government Accountability Office (GAO) on the approaches of the National Aeronautics and Space Administration (NASA) to ensure reasonable utilization through 2020. It revisits the knowledge gained by NASA on orbit performance. It notes the strategy...

  • Forging Ahead. Morring, Jr., Frank // Aviation Week & Space Technology;1/12/2015, Vol. 177 Issue 1, p56 

    The article focuses on the planning of electronic system provider Sierra Nevada Corp. for further testing and development of the Dream Chaser, space transportation system. It mentions that propose of the reusable lifting-body vehicle for the U.S. National Aeronautics and Space Administration...

  • NASA Delays First SLS Launch Until No Later Than November 2018. Host, Pat // Defense Daily;8/28/2014, p7 

    The article reports the move by the U.S. National Aeronautics and Space Administration (NASA) in late August 2014 to delay the launching of its Space Launch System (SLS) heavy lift, exploration class rocket until no later than November 2018. The agency also conducted a Key Decision Point C...

Share

Read the Article

Other Topics