TITLE

Rebuilding Iraq: Reconstruction Progress Hindered by Contracting, Security, and Capacity Challenges: GAO-07-426T

PUB. DATE
February 2007
SOURCE
GAO Reports;2/15/2007, p1
SOURCE TYPE
Government Documents
DOC. TYPE
Article
ABSTRACT
The Department of Defense (DOD) has relied extensively on contractors to undertake major reconstruction projects and provide support to its deployed forces, but these efforts have not always achieved desired outcomes. Further, the Iraqi government must be able to reduce violence, sustain reconstruction progress, improve basic services, and make a positive difference in the daily lives of the Iraqi people. This statement discusses (1) factors affecting DOD's ability to promote successful acquisition outcomes on its contracts for reconstruction and for support to deployed forces in Iraq, (2) the deteriorating security situation and the capabilities of the Iraqi security forces, and (3) issues affecting the Iraqi government's ability to support and sustain future reconstruction progress. The testimony is based upon our work on Iraq reconstruction and stabilization efforts, DOD contracting activities, and DOD's use of support contractors spanning several years. This work was conducted in accordance with generally accepted government auditing standards. The challenges faced by DOD on its reconstruction and support contracts often reflect systemic and long-standing shortcomings in DOD's capacity to manage contractor efforts. Such shortcomings result from poorly defined or changing requirements, the use of poor business arrangements, the absence of senior leadership and guidance, and an insufficient number of trained contracting, acquisition and other personnel to manage, assess and oversee contractor performance. In turn, these shortcomings manifest themselves in higher costs to taxpayers, schedule delays, unmet objectives, and other undesirable outcomes. For example, because DOD authorized contractors to begin work before reaching agreement on the scope and price of that work, DOD paid millions of dollars in costs that were questioned by the Defense Contract Audit Agency. Similarly, DOD lacks visibility on the extent to which they rely on contractors to support their operations. When senior military leaders began to develop a base consolidation plan, officials were unable to determine how many contractors were deployed and therefore ran the risk of over- or under-building the capacity of the consolidated bases. U.S. reconstruction efforts also continue to be hampered by a security situation that continues to deteriorate. Although the number of trained and equipped Iraqi security forces increased to about 323,000 in December 2006 and more Iraqi Army units have taken the lead for counterinsurgency operations, attacks on coalition and Iraqi security forces and civilians have all increased. Aggregate numbers of trained and equipped Iraqi forces, however, do not provide information on the capabilities and needs of individual units. GAO has made repeated attempts to obtain unit-level Transition Readiness Assessments (TRAs) without success. This information is essential for the Congress to make fully informed decisions in connection with its...
ACCESSION #
24272524

 

Related Articles

  • Defense Contracting: Actions Needed to Explore Additional Opportunities to Gain Efficiencies in Acquiring Foreign Language Support. Pickup, Sharon L. // GAO Reports;2/25/2013, p1 

    The article presents a report issued by the U.S. Government Accountability Office (GAO) on the Department of Defense's (DoD) acquisition of foreign language support. It provides a background of the DoD which relies on contractors to provide foreign language support to ensure military personnel...

  • Defense Logistics: Improved Oversight and Increased Coordination Needed to Ensure Viability of the Army's Prepositioning Strategy: GAO-07-144.  // GAO Reports;2/15/2007, p1 

    Prepositioned military equipment and supplies on ships and overseas on land have become an integral part of the U.S. defense strategy. However, the Army's program has faced long-standing management challenges, including equipment excesses and shortfalls, invalid or poorly defined requirements,...

  • Business Systems Modernization: Strategy for Evolving DOD's Business Enterprise Architecture Offers a Conceptual Approach, but Execution Details Are Needed: GAO-07-451.  // GAO Reports;4/16/2007, p1 

    In 1995, we first designated the Department of Defense's (DOD) business systems modernization program as "high risk," and we continue to designate it as such today. To assist in addressing this high-risk area, Congress passed legislation consistent with prior GAO recommendations for Defense to...

  • Comments on Proposed Changes to Profit Policy (DFARS Case 2000-D018): GAO-02-227R. Woods, William T. // GAO Reports;11/20/2001, p1 

    In July 2000, the Department of Defense published a proposed revision of its guidelines for developing profit objectives used in contract negotiations. The existing profit policy guidelines address investment in facilities and equipment, performance risk, and contract type risk. For each profit...

  • US Defence Equipment Acquisition: Style and Substance. Leibstone, Marvin // Military Technology;Jul2004, Vol. 28 Issue 7, p6 

    Focuses on issues related to the style and substance of U.S. defense equipment acquisition. Military transformation from a current list of high-dollar products and systems; Total value of the items included in the transformation; Preference of the U.S. Department of Defense remain open to...

  • The Coming Defense Bonanza. Taylor, Alexander; Hillenbrand, Barry; Kane, Joseph J. // Time; 

    The article focuses on the plan of the U.S. Department of Defense to buy ships, planes, missiles and other military equipments. Contractors are awaiting sales bonanza from U.S. President Ronald Reagan Administration's military buildup. The President wants to increase the defense budget from...

  • military bets: Balancing Bandwidth Needs with Increased Efficiency dustry Year in Review.  // VIA Satellite;Dec2013, Vol. 29 Issue 12, p11 

    The article reports that the U.S. Department of Defense (DoD) military planners need to deal with defense budgets and fewer ground forces with the drawdown in Afghanistan complete and new hot spots emerging. It is noted that the military will deploy increasingly more sensors with fewer eyes on...

  • Defense Industry Students Graduate Advanced Program Management Course. Mitchell, Michael C. // Program Manager;Jul/Aug97, Vol. 26 Issue 4, pN.PAG 

    Diminished business opportunities faced by defense firms since the end of the Cold War have been accompanied by a bewildering pace of change in the way the U.S. Department of Defense (DoD) does business with its suppliers. Laws streamlining acquisition procedures have been passed by Congress at...

  • Military-Industrial Duplex. Munro, Neil // National Journal;9/23/2006, Vol. 38 Issue 38, p3 

    The article reports on the budget allocated for the military-industrial complex of the U.S. Department of Defense in 2006. It cites the amount donated by military contractors in 2003 and 2004. It states that the department's budget has increased since the September 11, 2001 terrorists attacks in...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics