TITLE

Effect of Project Performance on Organization Performance in Sudanese Construction Industry

AUTHOR(S)
Sulieman, Hassan Ahmed; Adlan, Shamboul Adlan M.
PUB. DATE
July 2016
SOURCE
Jordan Journal of Civil Engineering;2016, Vol. 10 Issue 3, p297
SOURCE TYPE
Academic Journal
DOC. TYPE
Article
ABSTRACT
This paper aims at designing a model to relate construction project performance to Sudanese construction organization performance using financial and non-financial metrics along with objective and subjective measures. The study used an extensive literature review in the field of construction management and professional advice in order to design a questionnaire for data collection. EQS6.2 software was used for data analysis and model fit evaluation. The model showed a strong relationship between construction project performance and Sudanese construction organization performance, as well as strong relationships between construction project performance and its metrics ("project profitability", "external customer satisfaction" and "internal customer satisfaction"). Furthermore, strong relationships were found between Sudanese construction organization performance and its metrics ("financial", "customer", "internal business" and "learning and growth" perspectives).
ACCESSION #
116419441

 

Related Articles

  • Reviewing Resource Leveled Schedules Using P6â„¢. Winter, Ronald M. // AACE International Transactions;Jun2015, p1876.1 

    Standard CPM schedule review techniques are insufficient to review automatically resource leveled schedules. When faced with the task of reviewing resource leveling, most reviewers try to pretend that it does not exist and ignore this facet of the schedule submittal. This paper provides a guide...

  • Combining Forensic Schedule Analysis Techniques. Nagata, Mark F.; Lowe, J. Scott // AACE International Transactions;Jun2015, p2064.1 

    The AACE's Recommended Practice No. 29R-03, Forensic Schedule Analysis, identifies nine forensic schedule analysis techniques. Delay analysis experts have strong opinions regarding the use of their preferred forensic schedule analysis technique over other techniques. Their opinions are largely...

  • Risk Monitoring and Control in Construction Projects. Salah, Ahmad; El Sayed Moselhi, Osama // AACE International Transactions;Jun2015, p1939.1 

    Successful risk monitoring provides early warnings of possible failures in assigned risk mitigation strategy. Early warnings allow risk owners to take corrective actions to avoid or reduce the consequences associated with these failures. Current practice utilizes several risk monitoring and...

  • Re-Assessing KPIs and Trend Charts for Staff, PMs and Stakeholders. Stillman, Mark; Norwood, John // AACE International Transactions;Jun2015, p1938.1 

    One of the least developed techniques in managing costs and schedules on programs is the creation and management of Key Performance Indicators (KPIs) and trend charts. Typically, KPIs are established using standard metrics such as cost, time, quality, and safety. While these metrics will...

  • Using Theoretical S-Curve to Forecast Project Duration Considering Past Performance. Monteiro, Rafael Gonçalves; Daher, Vinicius Oliveira // AACE International Transactions;Jun2015, p1986.1 

    Project controls tools are considered keystones to project managers regarding costs, schedule and risk management. Projects' environments are really challenging and unsettled; therefore, procedures and standards for estimating, planning, controlling and forecasting are truly welcome....

  • The Evolving Discipline of Project Execution. Plumery, Richard C.; Ciuk, Stefan // AACE International Transactions;Jun2015, p2005.1 

    Retrospective, forensic-based project controls systems are no longer effective with today's increasingly complex and faster-track projects. Bureaucratic and sluggish systems using trailing indicators often elongate the resolution of project issues and often obscure them. Duration-based costs...

  • Master Control Schedule - Planning and Risk Analysis Method. Kovalenko, Yaroslav; Gough, Martin J.; Krahn, Mark // AACE International Transactions;Jun2015, p2046.1 

    The requirement to provide schedule risk assessment at early stages of project development, when no detailed schedules have been developed, has proven to be problematic. Then again, this is also true throughout project execution as detailed schedules are developed, elaborated and revised. The...

  • Delay Principles Based on Completion Risk. de Leon, Gui Ponce; Puri, Vivek // AACE International Transactions;Jun2015, p1822.1 

    Where the approach to scheduling a project is deterministic, the critical path is deemed to be certain. Conventional delay principles flowing from this assumption include: 1) a delay off the critical path within total float does not impact completion, and 2) a delay on the critical path equates...

  • Risk Management Capability Assessment. Fussell, Louis // AACE International Transactions;Jun2015, p1955.1 

    Risk management is a recommended practice for project management and a growing practice with major organizations. Risk management is important in assessing and responding to threats, opportunities, and uncertainties that organizations face at a project, program, and enterprise level. A high...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics