TITLE

Application of Earned Value Based Metrics on Small-Scale Construction Projects / Primena Metode Ostvarene Vrednosti U Praćenju Manjih Građevinskih Projekata

AUTHOR(S)
Avlijaš, Radoslav; Avlijaš, Goran; Heleta, Milenko
PUB. DATE
October 2015
SOURCE
European Journal of Applied Economics;Oct2015, Vol. 12 Issue 2, p1
SOURCE TYPE
Academic Journal
DOC. TYPE
Article
ABSTRACT
The application of earned value based metrics in Serbia lags significantly behind other developed economies, regardless of the fact that is has proven to be a very useful and flexible tool for prediction of total cost and time of construction projects. This paper aims to contribute to the wider use of earned value management (EVM) as a practical metrics that can be used to track performance of small-scale construction projects. Literature review reveals how the method evolved as a fundamental tool for construction projects monitoring and refers to specific issues concerning its implementation. In order to enable practitioners to realize all advantages of earned value based performance monitoring of small-scale construction projects, the applicability of such methodology is demonstrated through a case study.
ACCESSION #
110833844

 

Related Articles

  • Identification of Factors Affecting Cost Performance of Construction Projects. Abas, M.; Khattak, S. B.; Akhtar, R.; Ahmad, I.; Ullah, M.; Haq, I. U. // Technical Journal of University of Engineering & Technology Taxi;2016, Vol. 21 Issue 1, p72 

    Construction projects are measured in terms of cost, quality and time. Project success is related to completion of projects within a specified budget. Khyber Pakhtunkhwa (province of Pakistan) is facing project management related issues such as cost overrun. Cost is among the most important...

  • worldview: Lima, Peru. Liao, Janet // PM Network;Sep2007, Vol. 21 Issue 9, p80 

    The article provides information on some of the new economic development projects underway in Lima, Peru. It is reported that Port of Callao, which is Peru's biggest and most important port, will soon get even bigger; the Jose Chavez International Airport is in for US$1.4 billion worth...

  • Gas pipeline boosts Oman growth. Thompson, Richard // MEED: Middle East Economic Digest;9/24/2010, Vol. 54 Issue 39, p21 

    The article reports an increase on the Gulf Cooperation Council's market of construction and development projects in the Middle East, which grew by 0.22 percent, 2.297 trillion U.S. dollars from 2.292 trillion as of September 15, 2010.

  • A 21st Century Vision. Haworth, Neil // DPC: Dredging & Port Construction;Jan2008, p21 

    The article focuses on several major economic development projects which were aimed to attract foreign investments in Bahrain. They include the Bahrain Financial Harbour, the Ritz Carlton II construction project, and the North Bahrain New Town housing project. Meanwhile, it examines some factors...

  • Effective Use of Earned Value for Controlling Construction Projects. Bowman, Laurie; Sabouri, Mina // AACE International Transactions;2014, p1 

    The effective management and control of construction performance is a key determinant in overall project success. It is in the interests of both the contractor and the owner to plan, measure, monitor and control construction progress so that: 1. Project managers are well informed of problems and...

  • Task Packaging and Project Controls. Lott, Adam Carver // AACE International Transactions;Jun2015, p1829.1 

    Task Packages, or Install Task Packages, have served as a pre-planning tool across the industry to increase the description of a project's plan at a micro level to be useable by the craft executing the work. While many projects and companies have begun implementation of their own version of...

  • Comparison of Earned Schedule to EVMS Schedule and Metrics. Clendenon, Ronald L.; Muehleisen, Daniel Paul // AACE International Transactions;Jun2015, p1959.1 

    This paper summarizes an analysis of a comparison between standard EVMS metrics and an Earned Schedule (ES) approach, to see if use of ES would provide more meaningful forecasting data versus conventional EVMS analyses. Seven facilities were initially selected for this analysis, which are part...

  • If At First You Do Not Succeed, Then Try Risk Workshops. Wagner, Tom // AACE International Transactions;Jun2015, p1964.1 

    One company's approach to address an identified enterprise-wide maturity gap in managing project risk was to develop a focused risk workshop based on company standards, AACE® International recommend practices, Project Management Institute® Project Management Body of Knowledge® and other...

  • A Critical Analysis of the ANSI/EIA Standard for EVMS and the TCM Framework. Melamed, Dan; Plumery, Richard C. // AACE International Transactions;Jun2015, p2041.1 

    This paper discusses a critical analysis used for a recent Recommended Practice (RP) providing an Earned Value Management (EVM) overview for projects with EVM based upon the ANSI/EIA-748 EVMS Standard. This effort is being undertaken in order to better develop RPs for the application of EVM...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics